Muffin Top

In the midst of putting together July’s newsletter, tech editing the Summer Gratis Knits pattern, and updating the website, The Blogger –

(Shown above, being camera-shy, with the final draft of the new Gratis Knits)

– and I realized something terrible…

We hadn’t updated The Blog in over a month.

We’re overdue several articles, we know – True Plies about Habu Fique and Rowan Cotton Purelife, gossip from TNNA, No Mean Feet updates – but there’s one item we’ve been intending to bribe our readers with for some time.

A free pattern for the Muffin Cap I made with that Fleece Artist Blue-faced Leicester roving, circa April . Several members of the staff clearly had fun trying on the second cap I made with this pattern:

Sooo, in order to whet your appetite for the next Gratis Knits, below’s a free pattern (written by moi and edited by The Blogger). Until our next update, look for the new Gratis Knits (and an exciting KAL announcement) next week!

~*~*~

A Very Basic Muffin Cap

by Sara Morris

Sizes

S (M, L)

Head circumference: 18 (20, 22)”

Materials

  • 1 (1, 1) skein Fleece Artist BFL Aran
  • US 9 (5.5mm) DPNs, set of 5.
  • US 9 (5.5mm) circular needle, 16″ long
  • US 7 (4.5mm) circular needle, 16″ long
  • Stitch markers
  • Tapestry needle

Gauge:

16 sts & 20 rows = 4” in St st

Abbreviations:

CO Cast on
Kf&b Knit into front and back of st
PM Place marker
Rnd round
St stitch
K knit
SM slip marker
Dec decrease
K2tog knit 2 together (dec one st)
BO bind off

~*~*~

Pip:

Using DPNs, CO 4 sts. Work in i-cord for 4 rows.

Crown increases:

Rnd 1: Kf&b every st (8 sts), PM to indicate start of rnd. Switch to knitting in the rnd by placing 2 sts on each of 4 needles.

Rnd 2: Kf&b every st (16 sts).

Rnd 3: K around.

Rnd 4: *K1, kf&b, PM* around (24 sts).

Rnd 5: K around.

Rnd 6: *K to 1 st before marker, kf&b, SM* across rnd (32 sts). (Note: when there are too many sts to fit on the DPNs, switch to larger circular needle)

Repeat Rnds 5 – 6 another 10 (11, 12) times, until there are 112 (120, 128) sts.

Body:

Continue to knit in the rnd, as established, for another 2 (2.5, 3)”. On last stockinette row, dec 4 (0, 2) sts evenly across for 108 (120, 126) sts.

Brim:

Prep rnd: Using smaller circular needle, *K1, k2tog* around for a total of 72 (80, 84) sts.

Rows 1 – 5: *K1, p1* around.

Row 6: work *K1, p1* BO.

Finishing:

Weave in ends and cinch in pip at top. Block the cap flat, smoothing out the decreases and body. Wear in cool weather!

The post Muffin Top appeared first on Knit Purl Blog.

June 25, 2008 by Sara M
previous / next

Leave a comment

Please note: comments must be approved before they are published.